S-Line streetcar extension underway as UTA begins summer construction schedule
Star
•
May 21, 2026
•
0 Views
The S-Line streetcar is about to get an extension, and the 2100 South grade crossing is set to be rebuilt as the Utah Transit Authority (UTA) is starting its summer construction schedule.
Source: https://www.abc4.com/feed/ - Read Original
Discussion (0)
Please log in to post a comment.
No comments yet. Be the first to share your thoughts!