US-20 Traffic Alert: Buffalo River Bridge repairs set to begin Monday in Island Park
Island Park
•
April 22, 2026
•
0 Views
On Monday, April 27, crews will begin working to stabilize the soil where the bridge meets the roadway and repave sections to create a smoother ride and "preserve the longevity of US-20 in the area."
Throughout the duration of the project, US-20 traffic will be reduced to one lane in each direction around Buffalo River Bridge and Pond’s Lodge.
Throughout the duration of the project, US-20 traffic will be reduced to one lane in each direction around Buffalo River Bridge and Pond’s Lodge.
Source: https://localnews8.com/feed/ - Read Original
Discussion (0)
Please log in to post a comment.
No comments yet. Be the first to share your thoughts!