🍂 Enjoy the Fall Season! 🍂
MindTheDesk

A 2,900-pound section of steel pipe filled with Cold War waste locked in cement is rolling from a New Mexico mesa to a salt bed 2,150 feet down, one section to a box, with 792 boxes packed and the state's deadline set: all of it gone by July 2028 - Autono

Mesa Archived • September 29, 2026 •
A 2,900-pound section of steel pipe filled with Cold War waste locked in cement is rolling from a New Mexico mesa to a salt bed 2,150 feet down, one section to a box, with 792 boxes packed and the state's deadline set: all of it gone by July 2028  Autonocion.com
Source: Local desk — Los Alamos | https://news.google.com/rss/search?q=%22Los%20Alamos%22%20New%20Mexico&hl=en-US&gl=US&ceid=US:en - Read Original
"Output is a realization of Input."
"Monetize your website or boost your business with Code-Oryx. Join the network today!"

Discussion (0)

Please log in to post a comment.

No comments yet. Be the first to share your thoughts!

Sponsored
"Free Quote Today"