A 15.9-megawatt Oregon powerhouse that has not made a watt in eight years is having the blades cut off its second turbine so the canal above it can dump storm runoff through the empty 12-foot pit, after gutting the first one opened up 1,000 cubic feet a s
Eugene
Archived
•
October 27, 2026
•
A 15.9-megawatt Oregon powerhouse that has not made a watt in eight years is having the blades cut off its second turbine so the canal above it can dump storm runoff through the empty 12-foot pit, after gutting the first one opened up 1,000 cubic feet a secon Autonocion.com
Source: Local desk — Eugene | https://news.google.com/rss/search?q=Eugene%20Oregon&hl=en-US&gl=US&ceid=US:en - Read Original
Discussion (0)
Please log in to post a comment.
No comments yet. Be the first to share your thoughts!



